Cold Central Plant Recycling
Find a Contractor/Supplier

Notification

As with all road construction projects, keeping residents and road users notified and informed of upcoming activities is helpful in minimizing confusion, motorist delays and complaints. Extra care should be taken to adequately inform the public and other stakeholders regarding the work.

Notification practices vary from agency to agency and from job to job, but some common forms of notification include one or more of the following:

  • Letters and/or emails to all affected parties
  • Hand-delivered notices to properties abutting the project
  • Temporary "No Parking" signs at appropriate intervals on the project
  • Electronic message boards set up in advance of the work
  • Reverse 911 automated telephone messages to property owners
  • Posting project information on the agency's website
  • Social media messaging of the upcoming work
  • Conventional media (TV, radio and newspaper) notices

Notification message content varies, but usually includes the following information to address six basic questions:

  • What? (a brief description of the treatment being used)
  • Where? (the street names and limits of the work for each)
  • When? (the days, dates and hours of work including a proviso for weather or other unforseen delays)
  • Why? (an explanation of the treatment being applied and the expected benefits)
  • How? (a general sequence of construction events including their potential impacts on travel times and roadway use)
  • Who? (the names of those involved with the project including who to contact with questions)

A thoughtfully concieved and executed notification plan can greatly enhance public satisfaction with pavement recycling.


General Preparation

  • Patch areas of insufficient support
  • If obtaining RAP from an existing pavement rather than an existing stockpile, determine the presence of paving fabric and develop a plan to address its presence
  • Mark utility locations, lower or adequately protect and work around
  • Set up traffic control so traffic can be safety piloted around the paving equipment
  • Remove crack sealant and pavement markings if required
  • Conduct pre-construction personnel training on CCPR for agency, contractor, quality assurance, inspectors
  • Clean roadway free of dirt, vegetation, standing water
  • Crush and/or screen RAP when mixing is a separate operation