Prepared By: J. Mallela, H.L. Von Quintus, And K.L. Smith
Arizona studies 17 CIR projects constructed from 1981 to 2001, finds improved IRI, better resistance to cracking, lower post-construction maintenance costs, and “significant improvements in performance.”
J. Mallela, H.L. Von Quintus, And K.L. Smith. (2006). Performance Evaluation of Cold In-Place Recycling Projects in Arizona (Final Report 460). Phoenix, AZ: Arizona Department of Transportation.